Converting Projects
Project Objective: Plant Wide Process Assessment & Automation Plan
Customer: Specialty Converter, Eastern U.S.
PCT provided:
On site evaluation of all major process
equipment and material handling systems
Interviews with production, maintenance,
engineering, and management staff
Development of a plant wide automation
plan
Recommendations for equipment and
process modifications
Estimated costs and schedules to
complete modifications
Project Objective: Improve the Performance on Several Slitters
Customer: Midwest Location of Major Blown Film Producer
PCT provided:
On site evaluation of the slitters in order to
take measurements, observe machine
operation, and gather drawings and
program files
This evaluation considered input from
engineering, maintenance and operations
Modifications to the slitter speed and
tension control logic as required
Added taper tension control to improve
finished roll quality
Minimized lay on bounce
Optimized slitter for lock core winding
Retrofit existing controls and drive to
modern equipment
On site commissioning support for starting up and tuning the new control program
On site support for initial production at which time PCT continued to refine the system tuning
Przeglądanie stron 0
1 2 3

Podsumowanie treści

Strona 1 - Converting Projects

© 2007 PCT Engineered Systems LLC. All Rights Reserved Converting Projects Project Objective: Plant Wide Process Assessment & Automation Plan Cu

Strona 2

Project Objective: Upgrade Single-Layer Extruder to 7-Layer Extruder Customer: Midwest Location of Major Blown Film Producer PCT provided: • Integr

Strona 3 - The Solutions Team

Project Objective: Upgrade Line Drives and Reeler Control Systems Customer: Midwest Location of Major Blown Film Producer PCT provided: • Engineer